全网唯一标准王
ICS 27.140 CCS P 59 备案号:J2133— 2016 中国电力企业联合会标准 P T/CEC 5071—2022 抽水蓄能电站施工总布置规划 专题报告编制规程 Code for preparation of construction general la yout report of pumped storage power station 2022-10-26 发布 2023-02-01 实施 中国电力企业联合会 发布 T/CEC 《电子编加稿件》 XM95149 责编:娄雪芳 成品:140*203 责校: 版心:104*160 字数:28*29 行 天25 地 18 订 19 切 17 描图:2张 全国团体标准信息平台10mm 10 21mm T/CEC 5071—2022 定价:45.00元  全国团体标准信息平台 中国电力企业联合会标准 抽水蓄能电站施工总布置规划 专题报告编制规程 Code for preparation of construction general layout report of pumped storage power station T/CEC 5071—2022 主编机构: 中国电力企业联合会 批准机构: 中国电力企业联合会 施行日期: 2023年02月01日 中国电力出版社 2023 北 京 全国团体标准信息平台 中国电力企业联合会标准 抽水蓄能电站施工总布置规划 专题报告编制规程 Code for preparation of construction general layout report of pumped storage power station T/CEC 5071—2022 * 中国电力出版社出版、印刷、发行 (北京市东城区北京站西街 19号 100005 http://www.cepp.sgcc.com.cn ) * 2023年2月第一版 2023年2月北京第一次印刷 850毫米× 1168毫米 32开本 1.5印张 39千字 * 统一书号 155198·4593 定 价45.00元 版 权 专 有 侵 权 必 究 本书如有印装质量问题,我社营销中心负责退换 全国团体标准信息平台T/CEC 5071—2022 I 前 言 本规程根据中国电力企业联合会《2020 年第一批中国电力企 业联合会标准制订计划的通知》 (中电联标准〔2020 〕4 号)的要 求,由中国电力企业联合会抽水蓄能标准化技术委员会组织,中 国电建集团华东勘测设计研究院有限公司负责编写。 本规程编制过程中参考了国内及国际现行相关标准, 总结已建和 在建抽水蓄能电站施工总布置规划专题报告编制经验,制定本规程。 本规程主要技术内容包括:总则、基本规定、工程概况、施 工特性分析、施工总布置规划、料源选择与料场开采规划、场内交通规划、主要施工工厂设施和施工营地、土石方平衡及渣场规划、建设征地和移民安置、环境保护和水土保持、施工总布置方案研究、枢纽工程建设区用地和征地范围、结论和建议。 本规程由中国电力企业联合会提出,由中国电力企业联合会 抽水蓄能标准化技术委员会( CEC/TC 03 )归口管理。执行过程 中如有意见或建议,请寄送中国电力企业联合会标准化管理中心 (北京市白广路二条一号,100761 ) 。 本规程主要起草单位:中国电建集团华东勘测设计研究院 有限公司 本规程主要起草人员:吴 彬 范华春 赵林伟 徐 亮 张 磊 曾建平 王华福 汤优敏 张 翼 望佳琪 王 珊 颜锦凯 刘岭楠 陈晓宇 邓 磊 王 勤 陈 明 张晓昕 胡明庭 王璟玉 本规程主要审查人员:汪 毅 张亚武 张正平 许要武 章 鹏 李忠彬 李 冰 蒋逵超 赵 轶 汤飞熊 邱树先 贾 巍 杨铁荣 陈兆文 刘殿海 王 伟 全国团体标准信息平台T/CEC 5071—2022 II 目 次 1 总 则 ···························································································· 1 2 基本规定 ···················································································· 2 3 工程概况 ···················································································· 4 4 施工特性分析 ············································································· 5 5 施工总布置规划 ········································································· 6 5.1 规划原则 ············································································· 6 5.2 施工场地条件 ······································································ 6 5.3 施工分区规划布置方案 ······················································ 6 6 料源选择与料场开采规划 ························································· 8 6.1 料场概况 ············································································· 8 6.2 料源选择 ············································································· 8 6.3 料场开采及加工运输初步规划 ·········································· 9 7 场内交通规划 ··········································································· 10 7.1 场内交通规划布置原则 ···················································· 10 7.2 场内主要运输量和运输强度分析 ····································· 10 7.3 场内交通主要线路标准和规划布置 ································· 10 7.4 场内主要交通设施规划布置 ·············································11 8 主要施工工厂设施和施工营地 ··············································· 12 8.1 砂石加工系统规划布置 ···················································· 12 8.2 混凝土生产系统规划布置 ················································ 12 8.3 施工供风、供水、供电及通信系统 ································· 12 8.4 综合加工及机械修配厂 ···················································· 13 8.5 施工营地规划布置 ···························································· 13 9 土石方平衡及渣场规划 ··························································· 14 9.1 土石方平衡规划 ································································ 14 全国团体标准信息平台T/CEC 5071—2022 III 9.2 转存场及弃渣场规划 ············································

pdf文档 T-CEC 5071—2022 抽水蓄能电站施工总布置规划专题报告编制规程

文档预览
中文文档 10 页 50 下载 1000 浏览 0 评论 0 收藏 3.0分
温馨提示:本文档共10页,可预览 3 页,如浏览全部内容或当前文档出现乱码,可开通会员下载原始文档
T-CEC 5071—2022 抽水蓄能电站施工总布置规划专题报告编制规程 第 1 页 T-CEC 5071—2022 抽水蓄能电站施工总布置规划专题报告编制规程 第 2 页 T-CEC 5071—2022 抽水蓄能电站施工总布置规划专题报告编制规程 第 3 页
下载文档到电脑,方便使用
本文档由 思安 于 2023-06-03 00:20:58上传分享
友情链接
站内资源均来自网友分享或网络收集整理,若无意中侵犯到您的权利,敬请联系我们微信(点击查看客服),我们将及时删除相关资源。